November 2007

Nov2007_CleanerFlotationCells    Nov2007_RougherFlotationCells
 Cleaner flotation cells installed
 
 Rougher flotation cells installed
 Nov2007_PrimaryCrusherAndConveyor    Nov2007_LandConveyor
 Primary crusher and CV01 conveyor
 
 Land conveyor (CV02) that transfers ore from the primary crusher to plant site
 Nov2007_TransferConveyor    Nov2007_TailingsThickenerTunnel
 Transfer conveyor (CV03) from CV02 to crusher ore stockpile - trestles and ore reclaim
 
 Tailings thickener and tunnel
 Nov2007_HeavyVehicleWorkshop    
 Heavy vehicle work shop and offices
   

Share Price

Symbol Last Trade $ Change
ASX EQN 5.020 +0.010
TSX EQN 4.70 +0.04

Copper Price

Price (US$/lb) $ Change
3.269 0.039

ASX and TSX Logos ASX TSX Prices are delayed by at least 20 minutes.
Click a logo to view complete
online share information


Contacts

Perth Office

Ground Floor, 50 Kings Park Road
West Perth WA 6005
Tel: +61 (0) 8 9322 3318
Fax: +61 (0) 8 9324 1195

Toronto Office

Royal Bank Plaza, South Tower
200 Bay Street, Suite 2940
PO Box 54, Toronto, Ontario
Canada M5J 2J2
Tel: +1 (416) 865 3393
Fax: +1 (416) 865 3394


Join our mailing list

Click here to join our mailing list and keep up to
date with all the news at Equinox